Monday 11 April 2016

PRODUCTION SCEDULE

PRODUCTION SCHEDULE 

SATURDAY 10AM-3PM
Me and my group will shoot the trailer over a two day weekend of Saturday and Sunday. On the Saturday we will shoot the easier and more simple shots to give our selves and idea of how to use equipment effectively and familiarize our selves with the destination. We will shoot all of the shots that do not have Mr. Creek in, as the actor is unable to make this day; I feel as though this will be a productive use of our time. below are two examples of the shots that we have captured in advance, just of the location.




SUNDAY 10AM-4PM
On the Sunday we will continue to shoot, but this time, we will have our Mr.Creek actor with all the props and costume, so we can really delve into the more technical and scary parts of the trailer, which i am really excited about! This will now be much easier to find our way around the house, garden etc. as we have been there all day Saturday to establish appropriate settings. As you can see i, my group isn't going for any half measures, we are going to be shooting for around 5-6 hours each day to give us time to record all the video and sound to get the best possible outcome.

    WEATHER AND EQUIPMENT
In regards to the equipment, we will be using 2 high quality 1080p video cameras, which we will shoot most of the footage on, two tripods to get alternate angles, a microphone which attaches to the camera to get good audio and all the props and costumes including a top hat, tie, blazer, mask and a bag full of books. 
In regards to weather i will check the forecast before we shoot to distinguish the best possible weekend, as we want the sky to look dark, cloudy and gloomy to create an eerie atmosphere to fit the conventions of a horror movie.

No comments:

Post a Comment